资源预览内容
第1页 / 共31页
第2页 / 共31页
第3页 / 共31页
第4页 / 共31页
第5页 / 共31页
第6页 / 共31页
第7页 / 共31页
第8页 / 共31页
第9页 / 共31页
第10页 / 共31页
亲,该文档总共31页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述
OTIS Sky OTIS SIT T Asian Controller and Drive Dwg DAA29100K ADJ Date 2006 04 27 Sheet Sheets 1 31 Auth CA79A 001105 FIM Field Instruction Manual WITH OVF402R REGEN DRIVE Unpublished Work Copyright OTIS Elevator Company OTIS SKY with Regen Drive Adjustment manual APPLICABLE HARDWARE AND SOFTWARE ACD Controller TCBC OVF402R GDCB Running on PCB GDA26800KA A A26800AKT Software Version GAA30781AAE AAA30924BAA Wiring Diagram DAA21290AW ORIGINAL APPROVAL AUTH DATE yyyy mm dd AUTH DRAWN Last F I typed CHK Last F I typed APPD Last F I typed DWG SHEETS 2006 04 27 CA79A 001105 Yang Lin Cao Jinsuo Xia Yingzi 31 REVISION APPROVAL RECORD REV No REV DATE yyyy mm dd AUTH DRAWN Last F I typed CHK Last F I typed APPD Last F I typed DWG SHEETS 1 2 REVISION HISTORY REV NO REV DATE yyyy mm dd DESCRIPTION REASON FOR CHANGE 1 2 OTIS Sky OTIS SIT T Asian Controller and Drive Dwg DAA29100K ADJ Date 2006 04 27 Sheet Sheets 2 31 Auth CA79A 001105 FIM Field Instruction Manual WITH OVF402R REGEN DRIVE Unpublished Work Copyright OTIS Elevator Company Contents 1 REQUIREMENTS 3 2 PRELIMINARY CHECKS 3 2 1 Check of safety conditions 3 2 2 Prepare for safe measurements 3 2 3 Check the shield connection of cables 3 2 4 Insulation resistor check 4 2 5 Voltage check 4 2 6 TCBC LEDs Check 5 3 STARING UP IN INSPECTION 5 3 1 Parameter Setup 6 3 2 Encoder Adjustment LRT Locked Rotor Test 6 3 3 Check of Run Direction 7 4 PREPARE FIRST NORMAL RUN 8 4 1 Position DSBD connect 4T with 5T 8 4 2 Check of hoistway signals PRS 2 with RLEV ADO 9 4 3 Check of hoistway signals PRS 2 without RLEV ADO 10 4 4 Start up of the door system 11 4 4 1 Lock machine adjustment 11 4 4 2 Start up 12 4 4 3 Start up of DCSS5 17 4 5 Learn run 17 4 6 DCS Door Check Sequence 20 4 7 Load Weighing adjust 22 4 7 1 Parameter setup 22 4 7 2 Offset calibration 23 4 7 3 Gain calibration 24 5 FINAL ADJUSTMENT 25 5 1 Floor Level Adjustment 25 5 2 Start Jerk Rollback reduction 26 5 3 Check of ADO and RLV Option 27 5 4 Assignment for building configuration 27 5 5 Position Indicator setup 28 5 6 Turnover test for code inspection 29 6 REFERENCES 30 7 APPENDIXES 31 7 1 Adjustment of Blue Light machine s braking system 31 OTIS Sky OTIS SIT T Asian Controller and Drive Dwg DAA29100K ADJ Date 2006 04 27 Sheet Sheets 3 31 Auth CA79A 001105 FIM Field Instruction Manual WITH OVF402R REGEN DRIVE Unpublished Work Copyright OTIS Elevator Company 1 REQUIREMENTS Starting up of REGEN Drive Sky I system should be performed by authorized personal only The mechanical assembly works of the hoistway and the cab as well as the electrical installation in the hoistway and controller have to be finished to ensure successful inspection run The encoder has to be mounted at the machine and properly connected to the drive The electrical connections have to be completely installed and checked 2 PRELIMINARY CHECKS 2 1 Check of safety conditions Condition one The mechanical construction must be completed to a safe operation level Condition two Before starting take into consideration WWJSSS Lockout Tagout Procedures 2 2 Prepare for safe measurements Ensure that the main switch is switched off and switch to ERO mode Measure the line voltage between L1 L2 and L3 in controller TB1 no voltage should be measured Check the DSBD shunt connect 4T with 6T 2 3 Check the shield connection of cables First check the CAN bus drive to controller to make sure the shield properly connected on both ends of the cable Attention must connect drain wire to PE on both ends of the cable Shield cable connector OTIS Sky OTIS SIT T Asian Controller and Drive Dwg DAA29100K ADJ Date 2006 04 27 Sheet Sheets 4 31 Auth CA79A 001105 FIM Field Instruction Manual WITH OVF402R REGEN DRIVE Unpublished Work Copyright OTIS Elevator Company Second check the BCPC wiring to make sure the shield properly connected on both ends of the cable Attention must put the shield layer out of cable skin and use clamps to fasten shield layer of the power cable Third check the motor wiring to make sure the shield properly connected on both ends of the cable Attention must put the shield layer out of cable skin and use clamps to fasten shield layer of the power cable 2 4 Insulation resistor check Disconnect the connection of HL1 to PE and HL2 to PE The resistance values have to be checked with multimeter from PE to HL1 0 5M from PE to HL2 0 5M from PE to the line terminals L1 L3 0 5M from PE to the motor terminals U1 W1 0 5M Put in the HL1 HL2 PE connection again 2 5 Voltage check Check the power lines Switch on the main switch OCB and check the line input voltage 380VAC Switch on the fuse F1C controller and c heck the power supplies according to the diagram in TRF1 Check the remote serial link voltage Disconnect the connections of 1H and 1C Switch on the F6C controller and check the Voltage 1H 5 27 36VDC and 1C 4 27 36VDC Put in the 1H and 1C connections again Check the safety line Every safety switch has to be consecutively checked for its faultless functioning and the cor
收藏 下载该资源
网站客服QQ:2055934822
金锄头文库版权所有
经营许可证:蜀ICP备13022795号 | 川公网安备 51140202000112号