资源预览内容
第1页 / 共130页
第2页 / 共130页
第3页 / 共130页
第4页 / 共130页
第5页 / 共130页
第6页 / 共130页
第7页 / 共130页
第8页 / 共130页
第9页 / 共130页
第10页 / 共130页
亲,该文档总共130页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述
ICS 91 200 P 74 备案号 59676 2017 Reg No 59676 2017 JC 中 华 人 民 共 和 国 建 材 行 业 标 准 Professional standard of building materials industry of the People s Republic of China JCJ TJCJ T 3 3 20172017 代替 JCJ 03 1990 Supersedes JCJ 03 1990 水泥机械设备安装工程施工及验收规范水泥机械设备安装工程施工及验收规范 Code for equipment installing and acceptance of cement mechanical equipment 2017 04 12 发布 2017 10 01 实施 Issued on 2017 04 12 Implemented on 2017 10 01 中 华 人 民 共 和 国 工 业 和 信 息 化 部 发布 Issued by the Ministry of Industry and Information Technology of the People s Republic of China JCJ TJCJ T 3 2017 I 目目 次次 Contents FOREWORD IV 1 GENERAL PROVISIONS 1 2 TERMS 2 3 BASIC REQUIREMENT 3 3 1 GENERAL REQUIREMENT 3 3 2 EQUIPMENT ACCEPTANCE 3 3 3 FOUNDATION ACCEPTANCE 4 3 4 FOUNDATION MARKING 5 3 5 SHIM PLATE SELECTION 6 3 6 EQUIPMENT PLACEMENT AND GROUTING and add to the appendix the contents in relation to the correction of span measured by steel tape China National Building Material Construction Association shorted as CBMCA is repsonbsible for the explanation of specific technical contents in this Code Any advice raised from the implementation of this Code is welcomed to be delivered to CBMCA with the address at No 11 Beishuncheng Street Xizhimennei Beijing City Post Code 100035 E mail chinaceb which will be taken as reference for further revision Chief development organizations of this code China National Building Material Construction Association CBMI Construction Co Ltd Sinoma Suzhou Construction Co Ltd Sinoma Handan Construction Co Ltd China Building Material Machinery Association Participating development organizations of this code Beijing Triumph International Engineering Co Ltd Nanjing Kisen International Engineering Co Ltd China Building Materials Industrial Construction Xi an Engineering Co Ltd Chengdu Sinoma Zhongyuan Engineering Co Ltd Chiefdrafting staff of this code Liu Zhijiang Peng Jianxin Shen Jun Tong Laigou Yin Zhisong Shi Wenlong Ma Mingliang Wang Jun Zhou Yangming Liu Renyue Liu Jianmin Liu Jianying Wang Hui Chen Gong Liu Zhen Lu Fengming Luan Jun Zhang Hu Xie Hua Tan Qilin Zhu Min an Guo Weisheng Shen Qinyuan Du Huizhu Geng Fengtao Hu Dexin Sun Jianguo Zhong Libin Yang Shuzhou Fang Hua Su Gang Liu Zuhua Tao Ying Mei Da Wang Jianqiang Cheng Yu Wang Baocun Zhang Chunping Zhang Shufeng Xi Yan The perivous issued code superseded by this Code is JCJ 03 1990 JCJ TJCJ T 3 2017 1 1 General provisions 1 0 1 This Code is formulated with a view to achieve safe and reliable works advanced technology economy and rationality during the consturction and acceptance of cement mechanical equipment installation 1 0 2 This Code is applicable for the construction and acceptance of mechanical equipment installation works in cement plant 1 0 3 The installation of cement mechanical equipment shall include construction and acceptance starting from the opening of equipment packing till the completion of equipment no load test run In case the test run of equipment can only be done with load then the installation shall be till the completion of load test run 1 0 4 The construction of cement mechanical equipment installation works shall be in accordance with engineering design When any error is found in the design document or construction drawing during construction feedback and suggestion shall be put forward and the construction shall comply with the amended engineering design issued by the original design company 1 0 5 The mechanical equipment components and main material to be installed shall be in accordance with the requirements of engineering design and relative product standard and shall be supplied with qualification certificate 1 0 6 The various appliance apparatus instrument and equipment used for weighing and testing during the course of mechanical equipment installation shall comply with the requirements of current relevant national standard and their precision grade shall be in accordance with the requirements of the tested items The tools adopted for measurement of equipment centerline elevation and levelness shall be used upon confirmation in quality by the measurement authority 1 0 7 The construction and acceptance of cement mechanical equipment installation works shall meet not only the requirements specified in this Code but also those in the currenct relevant nationl standards JCJ TJCJ T 3 2017 2 2 Terms 2 0 1 Center reference plate A certain size of shaped steels or steel plates embedded on the surface of foundations along the center line at two ends of equipment serve to align the position of equipment when laying out the lines for equipment installation 2 0 2 Sand pier A trapezoidal cone made of cement mortar and positioned between equipment and its concrete foundation plays a role in adjusting the elevation of equipment and distributing the load bore by the shim plate to the concert foundation 2 0 3 Shim plate A metal plate placed between the concrete foundation or sandpier and the base frame of equipment functions to adjust the installation hei
收藏 下载该资源
网站客服QQ:2055934822
金锄头文库版权所有
经营许可证:蜀ICP备13022795号 | 川公网安备 51140202000112号