资源预览内容
第1页 / 共4页
第2页 / 共4页
第3页 / 共4页
第4页 / 共4页
亲,该文档总共4页全部预览完了,如果喜欢就下载吧!
资源描述
六月 27, 2018Project Name Electrical Power Monitoring Current per phase, Active Power (kW) per phase and total, Apparent Power (kVa) per phase and total, Reactive Power (kVAR) per phase and total, total Power factor, Frequency. 3.Energy Measurements a.Active Energy (kWh) import/export/net, Reactive energy (kVARh) import/export/net, Peak power demand (kW), Current demand, Peak current demand, Neutral current, Reactive power (kVAR) peak demand, Apparent power (kVA) peak demand.C.The meter shall calculate the following information for any reading at 1-second intervals: 1.Sliding window demands for any parameter with user-programmable length of demand period. 2.Number of sub-periods to match local utility billing method.D.The meter shall display “actual” readings on the display. No manual calculation shall be required to obtain actual readings. Multiply by 0.3 on the display shall not be allowed.E.The meter shall display all measured parameters on the front display. Simultaneous access to all parameters is available through the communications port.F.Standard logic functionality shall be available in the meter for setting up custom alarms that can be sent out via the digital output or through the communications port. G.The meters shall be field programmable as follows: 1.Basic parameters: Voltage input scale, voltage mode (Wye, Delta, single phase), current input scale, auxiliary input and output scales and communications setup parameters are programmable from the front panel. 2.All basic parameters described above may be programmed via the communications port using a portable or remotely located computer terminal. 3.Provisions must be made to ensure that programming through a computer can be secured by user ID and password. 4.Provisions must be made to ensure that programming through the front panel is secured by password.H.The meter shall include flash memory to store in non-volatile memory the following: 1.All setup data 2.Accumulated energy and demand data.2.4DESIGN Select either 2.4.A.1 or 2.4.A.2. For 2.4.A.2, select a, b, c, d, e, f or gA.The SENTRON PAC3100 meter shall be available in the following unit design configurations: 1.One-piece design that fits into an 96mmx96mm cutout. 2.Din Rail Mountable Version 3.Multi Meter Pack Enclosure (NEMA 1) with the following sizes: a.One meter b.Up to Two meters c.Up to Four meters d.Up to Six meters e.Up to Eight meters f.Up to Ten meters六月 27, 2018Project Name Electrical Power Monitoring & Control 26 09 13 31 00 16290 -4g.Up to Twelve meters PART 3 - EXECUTION3.1INSTALLATIONA.The Contractor shall furnish, install and terminate all communication conductors and associated conduits external to any factory supplied equipment.B.All of the communication conductor wiring and routing shall be per the manufacturers recommendations and as shown on the contract drawings.C.Additional connections to metering systems, where applicable, shall be done in the field by the manufacturers start-up service group the installing contractor.3.2ADJUSTING AND CLEANINGA.The meters shall be adjusted so that accurate readings appear on the front of the meter and that the readings are within the meters accuracy range.B.Clean exposed surfaces using manufacturer recommended materials and methods.3.3TESTINGA.Perform factory and installation tests in accordance with applicable NEC, NEMA and UL requirements.3.4WARRANTYA.Equipment manufacturer warrants that all goods supplied are free of non-conformities in workmanship and materials for one year from date of initial operation, but not more than eighteen months from date of shipment.END OF SECTION
收藏 下载该资源
网站客服QQ:2055934822
金锄头文库版权所有
经营许可证:蜀ICP备13022795号 | 川公网安备 51140202000112号