资源预览内容
第1页 / 共19页
第2页 / 共19页
第3页 / 共19页
第4页 / 共19页
第5页 / 共19页
第6页 / 共19页
第7页 / 共19页
第8页 / 共19页
第9页 / 共19页
第10页 / 共19页
亲,该文档总共19页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述
Environmental problems caused by Istanbul subway excavation and suggestions for remediationIbrahim OcakAbstract: Many environmental problems caused by subway excavations have inevitably become an important point in city life. These problems can be categorized as transporting and stocking of excavated material, trafc jams, noise, vibrations, piles of dust mud and lack of supplies. Although these problems cause many difculties, the most pressing for a big city like Istanbul is excavation, since other listed difculties result from it. Moreover, these problems are environmentally and regionally restricted to the period over which construction projects are underway and disappear when construction is nished. Currently, in Istanbul, there are nine subway construction projects in operation, covering approximately 73 km in length; over 200 km to be constructed in the near future. The amount of material excavated from ongoing construction projects covers approximately 12 million m3. In this study, problemsprimarily, the problem with excavation waste (EW)caused by subway excavation are analyzed and suggestions for remediation are offered.Keywords: Environmental problems Subway excavation Waste managementIntroduction Nowadays, cities are spreading over larger areas with increasing demand on extending transport facilities. Thus, all over the world, especially in cities where the population exceeds 300,000400,000 people, railway-based means of transportation is being accepted as the ultimate solution. Therefore, large investments in subway and light rail construction are required. The construction of stated systems requires surface excavations, cut and cover tunnel excavations, bored tunnel excavations, redirection of infrastructures and tunnel construction projects. These elements disturb the environment and affect everyday life of citizens in terms of running water, natural gas, sewer systems and telephone lines.One reason why metro excavations affect the environment is the huge amount of excavated material produced. Moreover, a large amount of this excavated material is composed of muddy and bentonite material. Storing excavated material then becomes crucial. A considerable amount of pressure has been placed on ofcials to store and recycle any kind of excavated material. Waste management has become a branch of study by itself. Many studies have been carried out on the destruction, recycling and storing of solid, (Vlachos 1975; Huang et al. 2001; Winkler 2005; Huang et al. 2006; Khan et al. 1987; Boadi and Kuitunen 2003; Staudt and Schroll 1999; Wang 2001; Okuda and Thomson 2007; Yang and Innes 2007), organic (Edwards et al. 1998, Jackson 2006; Debra et al. 1991; Akhtar and Mahmood 1996; Bruun et al. 2006; Minh et al. 2006), plastic (Idris et al. 2004; Karani and Stan Jewasikiewitz 2007; Ali et al. 2004; Nishino et al. 2003; Vasile et al.2006; Kato et al. 2003; Kasakura et al. 1999; Hayashi et al. 2000), toxic (Rodgers et al. 1996; Bell and Wilson 1988; Chen et al. 1997; Sullivan and Yelton 1988), oily(Ahumada et al. 2004; Al-Masri and Suman 2003), farming(Garnier et al. 1998; Mohanty 2001) and radioactive materials (Rocco and Zucchetti 1997; Walker et al. 2001; Adamov et al. 1992; Krinitsyn et al. 2003).Today, traditional materials, including sand, stone, gravel, cement, brick and tiles are being used as major building components in the construction sector. All of these materials have been produced from existing natural resources and may have intrinsic distinctions that damage the environment due to their continuous exploitation. In addition, the cost of construction materials is incrementally increasing. In Turkey, the prices of construction materials have increased over the last few years. Therefore, it is very important to use excavation and demolition wastes (DW) in construction operations to limit the environmental impact and excessive increase of raw material prices. Recycling ratios for excavation waste (EW) and DW of some countries are in shown Table 1 (Hendriks and Pietersen 2000). The recycling ratio for Turkey is 10%. Every year, 14 million tons of waste materials are generated in Istanbul. These waste materials consist of 7.6 million tons EW, 1.6 million tons organic materials and 2.7 million tons DW (IMM 2007). Approximately, 3.7 million tons of municipal wastes are produced in Istanbul every year. However, the recycling rate is approximately equal to only 7%. This rate will increase to 27%, when the construction of the plant is completed. Medical wastes are another problem, with over 9,000 tons dumped every year. Medical wastes are disposed by burning. Distributions of municipal wastes are given in Fig. 1CountryConcentration of CWin total waste (in%)CW and DWrecycled (in%)Denmark25-5080Netherlands2675Japan3665Australia4451Germany1950Finland1440United Kingdomover 5040USA2925France25
收藏 下载该资源
网站客服QQ:2055934822
金锄头文库版权所有
经营许可证:蜀ICP备13022795号 | 川公网安备 51140202000112号