资源预览内容
第1页 / 共9页
第2页 / 共9页
第3页 / 共9页
第4页 / 共9页
第5页 / 共9页
第6页 / 共9页
第7页 / 共9页
第8页 / 共9页
第9页 / 共9页
亲,该文档总共9页全部预览完了,如果喜欢就下载吧!
资源描述
litLA.fi制动器销售13782761872www. zhidongqichang. com制动器销售13782761872盘式制动器www zhidongqichaIndustrial disc brake device5SE-450SE-4SE-3SE5SH-450SH-4SH-3SF5SP-450SP-4SP-3SP失效保护制动器Useless protection brake安装、调整及维修手册Installment , adjustment and maintenance manual焦作市盘式制动器有限公司Jiaozuo Panshi brake co.,ltd1. 制动器的安装 brake install 操作者站在制动盘相对于制动器的对面。Operator who stand in brake disc is opposite to brake device1.1 拧紧手动松闸螺钉 4(螺钉规格见表 1)松开锁紧的制动器并移动杠杆和摩擦 衬垫,观察和调整两制动摩擦衬垫间的间隙。注意:手动松闸操作时,切勿引起电磁铁的运动。manually tightening screw 4 (screw specifications are seen in Table 1) loosen the locking brake and move the level and friction pad , observation and adjustment the gap between the brake and friction pad .attention: When operate the manual loose gate , make sure not to move the electro-magnet 1.2(向上)顺时针旋转棘轮 5 的手轮1 大约四分之一转(微调)(upward) clockwise rotate handwheels 1 ofnotch wheel 5 about 1/4 revolutions (trimming)1.3 (向下)逆时针旋转螺母2 (用一个04的销子)以便退回回推杆3,这将增加衬垫6 之间的间隙,继续该操作,直到两摩擦衬垫间隙超过制动盘的厚度。 (downward) anticlockwise rotate nut 2 (with a 04 pin) in order to return the throwout lever 3, this will increasethe gapsbetween the pad 6, continues this operation, until the gap between two friction padssurpasses brake discs thickness. 1.4将制动瓦置于其支撑物上,在制动衬垫之间插入制动盘,安装底座连接螺栓(螺栓规格见表 1)Brake tile is placedon its strutting ,insertbrake discbetweenthe brake pad, installs the foundation connecting bolt (bolt specification is seen inTable 1 ) 1.5 检查:A) 制动盘端面跳动,最大值 0.2mmB) 制动盘垫块相对于底座度: 4%C) 制动盘相对于底座的中心距(偏差) 2.5mm注意油漆时不要盖住显示棘爪运动方向的板1.5 inspections:A) Brake disc ending beat, maximum value 0.2mmB) The brake disc cushion compared with the foundation: 4%C) compared with the brake disc ,the center of the base (bias) 2.5mmAttentionwhen paint do not cover the board that demonstratethe movement direction of pawl2退距的调整 draws back adjustment操作者站在制动盘相对于制动器的对面Operator who stand in brake disc is opposite to brake device2.1 拧紧手动松闸螺钉 4(螺钉规格见表 1)松开锁紧的制动盘,并移动杠杆和 摩擦衬垫的间隙。注意:手动松闸操作时,切勿引起电磁铁的运动。manually tightening screw 4 (screw specifications are seen in Table 1) loosen the locking brake, move the pad between level and friction pad.attention: When operate the manual loose gate , make sure not to move the electro-magnet2.2 (向下)逆时针旋转棘轮5的手轮1大约四分之一(微调)(downward) clockwise rotate the handwheels 1 of notch wheel 5 about 1/4 revolutions (trimming)2.3 (向上)顺时针旋转螺母2(用一个04的销子)直到早制动摩擦衬垫和制 动盘间获得 0.50.7mm 的总计间隙。(upward) anticlockwise rotate nut 2 (with a 04 pin) until the space between early friction brake and brake disc was 0.5 0.7mm 注意:在调整制动摩擦衬垫时,电磁铁必须处于吸合状态。(见图 3)Attention: When adjustment brake friction liner, the electro-magnet must be in attracts gathers condition. (see in Figure 32.4 安装好电磁铁的防尘雨罩。Installs the dustproof rain shade to electro-magnet2.5 完全松开手动松闸螺钉 4 并拧紧锁定螺母。 Loosen the bolt 4 completely and screws tight the nut. /3、制动器的电力联接 connect brake device3.1 该制动器必须与 ESE 型经济电源配套使用。3.2打开接线盒的密封盖,用2X(010.5-015)的双A芯电缆磁铁的接线端子和 ESE 电源的十和一端子相连接,与极性无关。3.3 ESE电源的0-220-380电源的接线端子,必须接于相应的单相电源上(电缆 直径见表)3.1 this brake must use together with the ESE economical power source.3.2 open thesealing gland of connecting box, with 2X (010.5-015) dual-core cables magnet ESE Terminal Blocks and power of ten and a terminal connected with nothing to do with polarity.3.3 ESE power 0-220-380 power of the terminals must be received in the corresponding single-phase power on (see table diameter cable)with the double A core electric cable magnets binding clamp and the ESE power source ten and a post connect, has nothing to do with the polarity. 3.3 the ESE power sources 0-220-380 power sources binding clamps, must meet on the corresponding single-phase source (electric cable diameter see table)4、制动力矩的调整4.1 制动力矩是在工厂调整,并经试验台检验的。4.2 制动力矩值是可调的。松开铭牌8上的四个M4螺栓,取下铭牌板8,通过拧紧或松开螺母9和10(螺 母规格见表 3)来改变蝶形弹簧的变形量,调整制动力矩,拧紧,蝶形弹簧的变 形量增大,制动力矩也增大。注意:该操作影响安全,必须由熟练的设备维修工来操作。4, brake torque adjustment4.1 brake torque is adjusted in the factory, and the tested at test platform.4.2 brake torque value is adjustable.loosen the four bolts M4 onnameplate8, removed plate 8, through tightening or loosening nut 9 and 10 (nut specifications areseen in Table 3) to change the deformation of the butterfly spring, adjustbrake torque, tightening , The butterfly spring deformation increased braking torque is also increased.Note: the operationshave security problem. must be operated by trained equipment maintenance worker.5、制动摩擦衬垫的更换 Friction brake pad replacement 操作者站在制动盘相对于制动器的对面Operator who stand in brake disc is opposite to brake device5.1 紧手动松闸螺钉,移动杠杆和制动摩擦衬垫,观察衬垫和盘间的间隙。 注意:手动松闸操作时,切勿引起电动磁铁的运动manually tightening screw 4 move the level and friction pad , observation the gap between the brake and friction pad .attention: When operate the manual loose gate , make sure not to move the electro-magnet5.2 (向上)顺时针旋转棘轮 5 的手轮 1 大约四分之一转(微调)(upward) clockwise rotate the handwheels 1 of notch wheel 5 abou
收藏 下载该资源
网站客服QQ:2055934822
金锄头文库版权所有
经营许可证:蜀ICP备13022795号 | 川公网安备 51140202000112号