资源预览内容
第1页 / 共36页
第2页 / 共36页
第3页 / 共36页
第4页 / 共36页
第5页 / 共36页
第6页 / 共36页
第7页 / 共36页
第8页 / 共36页
第9页 / 共36页
第10页 / 共36页
亲,该文档总共36页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述
-Method StatementDocument Title:Construction of Traffic Diversion RoadsDocument No.:E*W-P011-0000-CM-CHE-MT-00068 -Rev.CDName & SignaturePositionDatePrepared By:Technical EngineerReviewed By:Technical ManagerApproved By:Project ManagerRevision HistoryRevisionDateDetails of revisionCA27-Apr-2014Submit for approval.CB28-May-2014ply with the ments from Halcrow dated on 6-May-2014CC12-Oct-2014ply with the ments from Halcrow dated on 23-Aug-2014CD20-Nov-2014ply with the ments from Halcrow dated on 18-Oct-2014. z.-SectionCONTENTSPage1.0Purpose 32.0Scope of Work33.0Responsibilities34.0Permits and Licences35.0Sequence of Construction of Traffic Diversion Roads46.0Resources to be used for Construction of Traffic Diversion Roads46.1 Reference46.2 Control, Storage & Protection of Specific Materials57.0Detailed method of Carrying Out this Method Statement58.0Quality Control and Requirements109.0Health & Safety Considerations109.1 General safety issues109.2Emergency Arrangement119.3 Consents and Permits1110.0Environmental Considerations1210.1 Environmental Aspects1210.2 Housekeeping1211.0Appendices12Appendi* A-Risk Assessment Appendi* B-Tool Bo* Talk Appendi* C-Inspection and Test Plan Appendi* D-Checklist FormSection1.0: Purpose This method statementis to describe the procedure and techniques of construction of traffic diversionroads in a safe manner that will satisfy all the requirements.Section 2.0: Scope of WorkThis method statement describes the activities related totraffic diversion roads, including site clearance(REF:E*W-P011-0000-CM-CHE-MT-00002), embankment(REF:E*W-P011-0000-CM-CHE-MT-00011、E*W-P011-0000-CM-CHE-MT-00006), sub-grade(REF:E*W-P011-0000-CM-CHE-MT-00011、E*W-P011-0000-CM-CHE-MT-00006), road base(REF:E*W-P011-0000-CM-CHE-MT-00025), asphalt work, installation of pole light(REF:E*W-P011-0000-CM-CHE-MT-00085), traffic signal(REF:E*W-P011-0000-CM-CHE-MT-00096), installation of sign board, safety barriersand road marking etc. These activities are covered in separated method statement.Section 3.0: ResponsibilitiesThe work will be carried out by CHEC, headed by the Construction Manager. Construction ManagerPartially responsible for the construction and arrangement of civil works,in charge of site engineer. HSE Engineer & HSE OfficerResponsible for HSE on site during construction, coordinate with Site Engineer, infrastructure superintendent. QC EngineerResponsible for quality of structure on site during construction, coordinate with Site Engineer, request for Inspection and Testing processes and coordination with the Engineers Inspectors representative. SurveyorResponsible for survey work and settlement monitoring work on site, coordinate with Site Engineer, the survey request process and coordination with the Engineers surveyor representative. Site Engineer Site engineer responsible for construction of work, coordinate with HSE Engineer, QA/QC engineer, surveyor, will in charge of foremen, operators, drivers, labours, reports directly to construction manager, request for Inspection and Testing processes and coordination with the Engineers Inspectors representative, as well as supervisor. Foreman-Directly supervises the work activity on the site and has full control over theuse of the labour, plant and equipment. He ensures that the work is carried out in fullpliance with the specification, and in a manner that conforms to the safety requirements.He reports to the Site Engineer when the work is plete and ready for inspection. All personnel (operators) should be qualified and the relevant certificate should be available.Section 4.0: Permits and LicencesWhere required as per project contract specification, permits & licences shall be obtained from relevant authorities prior to start with the related works or activities.Section 5.0: Sequence of Construction of Traffic Diversion RoadsThe sequence of traffic diversion roads as shown in the following chart:Sequence of Traffic Diversion RoadsSection 6.0: Resources to be Used for Construction of Traffic Diversion Roads6.1 References QCS 2010 HSE plan & Project quality plan approved by SC. Method statements which have been approved by Engineer:Method statement of engineering survey: E*W-P011-0000-CM-CHE-MT-00001.Method statement of site demolition and clearance: E*W-P011-0000-CM-CHE-MT-00002Method statement of soil filling and paction for road works: E*W-P011-0000-CM-CHE-MT-00011Method statement of aggregate road base and sub-base:E*W-P011-0000-CM-CHE-MT-00025 Approved BC Type-1 and SC Type-
收藏 下载该资源
网站客服QQ:2055934822
金锄头文库版权所有
经营许可证:蜀ICP备13022795号 | 川公网安备 51140202000112号